Details

System Name   chandra
Site Name  The Thematic Unit of Excellence on Computational Materials Science (TUE-CMS), Solid State and Structural Chemistry Unit, Indian Institute of Science
City  Bangalore
State  KARNATAKA
Vendor  OEM:IBM, Bidder:HCL
Installation Date   03-AUG-2016

 






SYSTEM

Description The 140 node system consists 113 nodes with 125 GibiBytes RAM, 12 nodes with 503 GibiBytes RAM, 8 nodes with nVidia K40x GPU, 4 nodes with Intel 7120p Xeon Phi Coprocessor, 2 Master Nodes, 1 Login Node, 400 TB DDN Storage and Intel 12800 QDR Infiniband Switch.
Processor Socket Intel Xeon E5-2630V4 @2.2 GHz dual twelve-core compute nodes) w/Infiniband
Network Infiniband 40Gbps inteconnect with IntelĀ® True Scale Fabric 12800 QDR Infiniband Switch






BENCHMARK
Nmax 1043136
Rpeak 150.83 TFlops
Rmax 96.89 TFlops






Software

Operating System Centos 7.2 (1511)